94
Chapter 6: Site survey/installation checklist
553-3202-210 Standard October 1998
Loading equipment required
Responsible party: _____________________________________________
Delivery constraints: ____________________________________________
Elevator capacity: ______________________________________________
Equipment delivery route to the equipment room: _____________________
_____________________________________________________________
Meridian 1 software checklists
To check the Meridian 1 software, use the Meridian 1 Overlay program 22
(LD 22) and obtain a printout of:
¥
the current software issue (ISS) and package list (PKG) as outlined in
the
Generic X11 Input/output Guide
(NTP 553-001-400). Compare the
printout with the following requirements and checklists.
¥
the ADAN information which will be required when setting physical
card address switches on the ESDI (QPC513G) or MSDL card.
¥
the tape ID (TID) which will be required when installing the Meridian
Link/CCR application. Use this information when prompted to enter
your Meridian 1 ID.
Summary of Contents for Link/Customer Controlled Routing
Page 2: ...ii 553 3202 210 Standard October 1998...
Page 4: ...iv Publication history 553 3202 210 Standard October 1998...
Page 14: ...xiv Contents 553 3202 210 Standard October 1998...
Page 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Page 132: ......
Page 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Page 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Page 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Page 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...