Chapter 6: Site survey/installation checklist
107
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Equipment cabling
The following tables provide checklists and references for checking the
cabling.
Input/output device cabling
Measure the cable distance for the input/output devices listed in Table 24.
For information on the proper cables and connections, refer to the
appropriate NTP.
Table 24
Input/Output devices cable distance
Input/Output devices
NTP
IPE Module or Application
Module to Meridian 1
(Link cable)
This guide
IPE Module or Application
Module to Meridian Mail
(Link cable)
This guide
PBX to Meridian Mail
(Link cable)
Options Installation Guide
(NTP 555-7011-210)
Options Maintenance Guide
(NTP 555-7011-500)
Meridian Mail Modular Option
Installation and Maintenance Guide
(NTP 555-7041-250)
Meridian Mail Modular Option GP
Installation and Maintenance Guide
(NTP 555-7051-250)
Meridian Mail Modular Option EC
Installation and Maintenance Guide
(NTP 555-7061-250)
Card Option Installation and
Maintenance Guide
(NTP 555-7071-210)
Summary of Contents for Link/Customer Controlled Routing
Page 2: ...ii 553 3202 210 Standard October 1998...
Page 4: ...iv Publication history 553 3202 210 Standard October 1998...
Page 14: ...xiv Contents 553 3202 210 Standard October 1998...
Page 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Page 132: ......
Page 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Page 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Page 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Page 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...