119
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Chapter 8: Hardware installation
procedures
!
CAUTION
Risk of data loss
Ensure that the breaker switch on the AEM is in the Off
position before following the procedures for installing an
Application Module.
You should use this chapter in conjunction with Chapter 5, ÒHardware
installation overview,Ó which links hardware installation procedures in
easily understood tables (Tables 11 and 12).
This chapter provides information on the installation of the IPE Module
(Option 11 and Options 21Ð81) and the Application Module hardware
components. High-level installation procedures for all three hardware
options are followed by procedures for installing components.
ATTENTION
Before proceeding with any hardware installation, upgrade, or update,
ensure that all discrepancies found in Chapter 6, ÒSite survey/
installation checklistÓ have been corrected.
Summary of Contents for Link/Customer Controlled Routing
Page 2: ...ii 553 3202 210 Standard October 1998...
Page 4: ...iv Publication history 553 3202 210 Standard October 1998...
Page 14: ...xiv Contents 553 3202 210 Standard October 1998...
Page 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Page 132: ......
Page 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Page 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Page 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Page 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...