Chapter 14: Software installation, upgrade, and update procedures
375
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
To configure the software after installing a new IPE Module
or Application Module
The UNIX and application software are loaded onto the hard disk at the
factory. Tapes containing the same software are shipped with your module
as a backup. A blank tape is needed to back up configuration data and
scripts.
When power is applied to the IPE Module or the Application Module, the
system boots up from the software loaded on the hard disk. Power also
activates the yellow LED on the SBC card in the IPE Module or the
Application Module. As long as this LED blinks intermittently, the system
is loading properly. If the LED remains dark or steadily lit (for 30 seconds
or more), there is a fault in the installed cards.
To configure the software after installing a new IPE Module or Application
Module
¥
Perform Procedure 1: Application configuration and start-up, in this
chapter.
¥
Check that the values of the default link parameters match the values in
Chapter 15, ÒLink configuration.Ó If you need to change any link
parameters, perform the procedures described in Chapter 15, ÒLink
configuration.Ó
Summary of Contents for Link/Customer Controlled Routing
Page 2: ...ii 553 3202 210 Standard October 1998...
Page 4: ...iv Publication history 553 3202 210 Standard October 1998...
Page 14: ...xiv Contents 553 3202 210 Standard October 1998...
Page 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Page 132: ......
Page 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Page 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Page 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Page 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...