
2KN/2KP
1-5-7
18. Clean or replace the separation pulley and
then reattach the pulley to the separation
pulley unit.
* When replacing the separation pulley, make
sure that the projection of the torque limiter
fits in the separation pulley groove.
19. Refit the separation pulley unit to the deck
conveying unit.
20. Refit the paper feed pulley unit to the pri-
mary paper feed unit of cassette 1.
21. Insert the joint to the paper feed pulley shaft,
and refit the primary paper feed unit cover to
the primary paper feed unit of cassette 1.
22. Refit the primary paper feed unit of cassette
1 to the deck conveying unit.
Figure 1-5-14
Projection
Groove
Projection
Summary of Contents for TASKalfa 620
Page 1: ...SERVICE MANUAL Published in August 2009 842KP112 2KPSM062 Rev 2 TASKalfa 620 820 ...
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 144: ...2KN 2KP 1 3 106 This page is intentionally left blank ...
Page 308: ...2KN 2KP 1 5 88 This page is intentionally left blank ...
Page 412: ...2KN 2KP 2 3 60 This page is intentionally left blank ...
Page 435: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR SIDE FEEDER ...
Page 442: ...INSTALLATION GUIDE FOR LARGE SIZE SIDE FEEDER ...
Page 460: ...INSTALLATION GUIDE FOR DOCUMENT FINISHER ...
Page 475: ...INSTALLATION GUIDE FOR CENTERFOLD UNIT ...
Page 490: ...INSTALLATION GUIDE FOR MULTI JOB TRAY ...
Page 501: ...INSTALLATION GUIDE FOR PUNCH UNIT ...
Page 512: ...INSTALLATION GUIDE FOR STOPPER GUIDE ...
Page 515: ...INSTALLATION GUIDE FOR PRINTING SYSTEM ...
Page 518: ...INSTALLATION GUIDE FOR SCAN SYSTEM ...
Page 520: ......
Page 521: ......