5 Installation
29
Procedure
1
Pouch
2
Clamp
3
Two-component sealing
compound
4
Desiccant packet
5
Maximum fill level
Figure 35: Procedure
1. Cut open the protective enclosure of the two-component
sealing compound (see packaging).
2. Remove the clamp of the sealing compound.
3. Knead both components thoroughly until a good mix is
reached.
4. Cut open the pouch at a corner. Perform work activity within
30 minutes.
5. Carefully fill the terminal box with two-component sealing
compound to above the connecting cable.
6. Wait a few hours before closing the cover to allow the
compound to dry, and to release any possible gas.
7. Ensure that the packaging material and the desiccant packet
are disposed of in an environmentally sound manner.
Change from two to one column
Summary of Contents for 406060
Page 2: ......
Page 98: ...13 Appendix 98 13 3 Declarations of conformity 13 3 1 JUMO flowTRANS MAG S10...
Page 99: ...13 Appendix 99...
Page 100: ...13 Appendix 100...
Page 101: ...13 Appendix 101...
Page 102: ...13 Appendix 102...
Page 103: ...13 Appendix 103...
Page 104: ...13 Appendix 104 13 3 2 JUMO flowTRANS MAG H10...
Page 105: ...13 Appendix 105...
Page 106: ...13 Appendix 106...
Page 107: ...13 Appendix 107...
Page 108: ...13 Appendix 108...
Page 109: ...13 Appendix 109...
Page 110: ...13 Appendix 110 13 3 3 JUMO flowTRANS MAG 10...
Page 111: ...13 Appendix 111...
Page 112: ...13 Appendix 112...
Page 113: ...13 Appendix 113...
Page 115: ......