6.4.10 Replacing a Main Control Board
Prerequisites
●
A main control board needs to be replaced.
●
A spare and functional main control board is available.
Context
Preparation: Maintain from the rear door with power-off.
Procedure
Step 1 Tap Shutdown on the home screen of the display module.
NO TICE
Exercise caution because the device is still energized after it is shut down on the
screen of the display module.
Step 2 Open the rear door and remove the air filter.
Step 3 Remove the cover of the electric control box. For details, see
.
Step 4 Remove the six screws from both sides of the main control board.
Figure 6-17 Replacing the main control board (NetCol5000-C065)
NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual
6 System Operation and Maintenance
Issue 04 (2021-03-15)
Copyright © Huawei Technologies Co., Ltd.
168