3.3 Installation Process
NO TICE
Remove the protective plastic bag from the cabinet only immediately before
installation. Do not remove the bag during equipment room renovation or
infrastructure construction; otherwise, dust may enter the cabinet and affect the
internal components.
Figure 3-15 Installation flowchart
3.4 Checking the Nitrogen Pressure
Context
●
The device has been injected with 0.2–0.6 MPa nitrogen before delivery. Check
the nitrogen pressure for nitrogen leakage.
●
You can open or close the exhaust valve using a flat-head screwdriver.
Procedure
Step 1 Open the door lock using a key, and open the cabinet rear door.
NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual
3 Installation
Issue 04 (2021-03-15)
Copyright © Huawei Technologies Co., Ltd.
45