
Table 34 Capacity block/storage checklist and required information checklist
(continued)
Completed?
(√ or N/A)
Capacity block/Storage requirement
Item
Enterprise / Relaxed
Minimum retention period (2 seconds
- 100 years)
25.
Seconds / Minutes / Hours / Days /
Months / Years
Maximum retention period (2 seconds
- 100 years)
26.
Seconds / Minutes / Hours / Days /
Months / Years
Default retention period (optional)
27.
Minutes / Hours / Days / Months /
Years
Set auto-commit period (5 minutes - 1
year) (optional)
28.
Y / N
Enable data validation
29.
Daily (time in the day) or weekly (days
in the week) and time in the day or
If yes, enter data validation scan
schedule
30.
monthly (list of days separated with
comma and time in the day)
Y / N
Enable report generation
31.
Snapshots
Frequency?
Schedule this
task?
File system?
32.
Y / N
Value?
How many to keep?
min
Hourly at (minutes past the hour)
hh
Daily at:
dd
Weekly on:
ww
Monthly on:
Software snapshots reclamation task details
33.
File system name
Y / N
Schedule this task?
Frequency?
196
Installation checklists