
Chapter 13 Specifications
259
13
(6) Measurement Speed
(7) Power Line Frequency Setting
(8) Zero Adjustment
(9) Averaging function
Setting
FAST/ MED/ SLOW1/ SLOW2
Default setting
SLOW2
Operation
Selects the line voltage frequency
Setting
AUTO (50 or 60 Hz, auto-detect)/ 50 Hz / 60 Hz
Default setting
AUTO (auto-detect upon power on and resetting)
Operation
Cancels the internal offset voltage and the surplus resistance.
Setting
ON/ OFF (clear): for each range
Scan zero adjustment ON/ OFF: Set by channel. (RM3545-02 only)
Adjustment range
Within ±50%f.s. for each range (warning message displayed when in excess
of ±1%f.s. for each range)
Zero-adjustment cannot be used at 100 M
Ω
or above (it is forcibly turned off).
Default setting
Zero adjustment: OFF, Scan zero adjustment: ON
Operation
A moving average is used when using the internal trigger source with continu-
ous measurement on (free-run). A mean average is used when using an exter-
nal trigger source or with continuous measurement off (non-free-run).
R
avg
: Average,
A
: Number of averaging iterations,
n
: Number of measurements,
R
k
: Measured value No.
k
Setting
ON/ OFF (When using the SLOW2 measurement speed with low-power resis-
tance measurement on, the instrument will performing averaging with two iter-
ations internally even if the averaging function is set to off.)
Number of averaging
iterations
2 to 100 times
Default setting
OFF, Number of averaging iterations: 2 times
Moving average
Mean average
−
+
=
=
1
)
a vg(
1
A
n
n
k
k
n
R
A
R
+
−
=
=
nA
A
n
k
k
n
R
A
R
1
)
1
(
)
avg(
1
Summary of Contents for RM3545
Page 2: ......
Page 4: ......
Page 26: ...Operating Precautions 18...
Page 42: ...1 5 Checking the Measurement Target 34...
Page 54: ...2 6 Pre Operation Inspection 46...
Page 70: ...3 5 Checking Measured Values 62...
Page 226: ...10 6 Supplied Connector Assembly 218...
Page 290: ...Chapter 13 Specifications 282...
Page 312: ...14 4 Disposing of the Instrument 304...
Page 349: ...Appendix 18 Outline Drawing A37 Appendix Appendix 18 Outline Drawing...
Page 362: ...Index Index 4...
Page 363: ......
Page 364: ......