
10.2 Timing Chart
192
Auto setting operation
Self-calibration starts immediately after measurement completes and is finished in 5 ms.
One TRIG signal received during self-calibration is held, and measurement will start after
the self-calibration completes.
•
During auto-scan operation, self-calibration starts only after scanning completes. Self-cal-
ibration will not be performed after each channel is measured.
•
A 400 ms self-calibration is performed immediately after switching from MANUAL to
AUTO. Do not input the TRIG signal during that interval.
If there is at least 5 ms of extra time in the measurement interval
If the TRIG signal is received during self-calibration
Measurement
processing
Measure-
ment
Self-
calibration
Self-
calibration
???
Measure-
ment
Self-
calibration
Self-
calibration
Measure-
ment
Measure-
ment
Measurement
processing
The TRIG signal received during self-cali-
bration is held.
Summary of Contents for RM3545
Page 2: ......
Page 4: ......
Page 26: ...Operating Precautions 18...
Page 42: ...1 5 Checking the Measurement Target 34...
Page 54: ...2 6 Pre Operation Inspection 46...
Page 70: ...3 5 Checking Measured Values 62...
Page 226: ...10 6 Supplied Connector Assembly 218...
Page 290: ...Chapter 13 Specifications 282...
Page 312: ...14 4 Disposing of the Instrument 304...
Page 349: ...Appendix 18 Outline Drawing A37 Appendix Appendix 18 Outline Drawing...
Page 362: ...Index Index 4...
Page 363: ......
Page 364: ......