
8.1 About the Multiplexer
141
8
Scan function
OFF
Step
Auto
Overview
The measurement location
can be changed freely.
Example uses
• Using the multiplexer
manually
• Repeating measurement
for particular channels
only
• Switching channels using
external control
The measurement location is
switched according to a pre-
viously set order. A single
TRIG signal causes one
channel to be measured.
Example uses
• Controlling the measure-
ment target during testing,
for example with switches
• Changing operation based
on each channel’s mea-
surement results
The measurement location is
switched according to a pre-
viously set order. A single
TRIG signal causes all chan-
nels to be measured.
Example uses
• Performing scanning at
the fastest possible speed
when controlling the mea-
surement target during
testing is not necessary,
for example for 3-phase
motor windings or net-
work resistors
Measurement
screen
Trigger source
Internal [INT] / External [EXT] External [EXT] only
External [EXT] only
Channel
switching
Up/down cursor operation,
commands, LOAD signal
Automatic switching based
on the trigger (channel by
channel)
Automatic switching based
on the trigger (all channels)
TRIG
operation
Acquisition of
each channel’s
measured val-
ue and judg-
ment results
Display,
Communications commands,
EXT I/O
Display,
Communications commands,
EXT I/O
Display,
Communications commands
Total judgment No
Yes
Yes
TRIG signal input
↓
Current channel
measurement
↓
Judgment,
EOM signal ON output
TRIG signal input
↓
CH1 measurement
↓
CH1 judgment,
EOM signal ON output
↓
TRIG signal input
↓
CH2 measurement
↓
CH2 judgment,
EOM signal ON output
↓
. . .
↓
TRIG signal input
↓
CHn measurement
↓
CHn judgment,
Total judgment,
EOM signal ON output
TRIG signal input
↓
CH1 measurement
↓
CH2 measurement
↓
. . .
↓
CHn measurement
↓
Total judgment,
EOM signal ON output
Summary of Contents for RM3545
Page 2: ......
Page 4: ......
Page 26: ...Operating Precautions 18...
Page 42: ...1 5 Checking the Measurement Target 34...
Page 54: ...2 6 Pre Operation Inspection 46...
Page 70: ...3 5 Checking Measured Values 62...
Page 226: ...10 6 Supplied Connector Assembly 218...
Page 290: ...Chapter 13 Specifications 282...
Page 312: ...14 4 Disposing of the Instrument 304...
Page 349: ...Appendix 18 Outline Drawing A37 Appendix Appendix 18 Outline Drawing...
Page 362: ...Index Index 4...
Page 363: ......
Page 364: ......