HI 2160RC
PLUS
MANUAL
3-8
FIG. 3-11 MOUNTING BARS AND MACHINE SCREWS INSTALLED
Step 6. The Panel Mount installation is complete.
Installation of HI
2160RC
Plus
- RM
Remote Panel
Model
NOTE:
See Figure 3-3 for information about the panel cutout.
Step 1. Make sure that all Electrostatic Discharge (ESD) precautions
have been taken, before installation.
Step 2. The controller comes with a NEMA 4 rated compression gas-
ket. Make sure the gasket is properly seated in the bezel
before installation.
Step 3. The front panel comes with two (2) mounting brackets
mounted on the bezel. (See Fig. 3-12)
Step 4. Remove the nuts that fasten the brackets to the bezel. (See
Fig. 3-13)
Step 5. Remove the brackets.
Step 6. Gently slide the front panel into the enclosure cutout until the
gasket is seated against the front of the enclosure. (See Fig. 3-
14)
NOTE:
The nuts on the mounting studs barely clear the cutout. It might take a little adjusting
to get the bezel into the cutout.
Summary of Contents for HI 2160RC PLUS
Page 1: ...HI 2160RCPLUS Rate Controller Operation and Installation Manual ...
Page 23: ...HI 2160RCPLUS MANUAL 2 6 ...
Page 49: ...HI 2160RCPLUS MANUAL 3 26 ...
Page 67: ...HI 2160RCPLUS MANUAL 4 18 ...
Page 91: ...HI 2160RCPLUS MANUAL 5 24 ...
Page 151: ...HI 2160RCPLUS MANUAL 7 12 ...
Page 187: ...HI 2160RCPLUS MANUAL 8 36 ...
Page 207: ...HI 2160RCPLUS MANUAL 9 20 ...
Page 219: ...Data Worksheets WKSHT 6 ...