Setup & Operation 9.2 Preparation for Communication (RS-232C Settings)
78
RC420 Rev.9
9.1.2 Connection Example
Example 1: Standard [Controller]
[Peripheral equipment]
Signal Name Pin No.
Pin No. Signal Name
SD 3 2 SD
RD 2 3 RD
SG 5 7 SG
RS 7 4 RS
CS 8 5 CS
DR 6 6 DR
CD 1 8 CD
ER 4 20 ER
Clamp Hood
1
FG
Example 2: H/W Flow Control
[Controller] [Peripheral
equipment]
Signal Name
Pin No.
Pin No.
Signal Name
SD 3 2 SD
RD 2 3 RD
SG 5 7 SG
RS 7 4 RS
CS 8 5 CS
DR 6 6 DR
CD 1 8 CD
ER 4 20 ER
Clamp Hood
1
FG
9.2 Preparation for Communication
For communication via RS-232C between the Controller and peripheral equipment to work,
the port configuration on both units must be the same.
For details on the set-up procedure and communication commands, refer to the section,
RS-232 Software Configuration
in the chapter,
RS-232 Communications
in EPSON RC+
User’s Guide.
Summary of Contents for RC420
Page 1: ...Rev 9 EM073C1492F ROBOT CONTROLLER RC420 ...
Page 2: ...ROBOT CONTROLLER RC420 Rev 9 ...
Page 12: ...Setup Operation ...
Page 20: ...Setup Operation 1 Safety 10 RC420 Rev 9 ...
Page 30: ...Setup Operation 2 3 Controller Part Names and Functions 20 RC420 Rev 9 ...
Page 50: ...Setup Operation 5 5 Circuit Diagrams EMERGENCY Connector 40 RC420 Rev 9 ...
Page 58: ...Setup Operation 6 3 Pin Assignments STANDARD I O Connector 48 RC420 Rev 9 ...
Page 114: ...Setup Operation 10 UPS Uninterruptible Power Supply 104 RC420 Rev 9 ...
Page 115: ...97 Maintenance This manual contains maintenance procedures for the RC420 Robot Controller ...
Page 116: ...Maintenance RC420 Rev 9 106 ...
Page 138: ...Maintenance 6 Motor Driver Module 128 RC420 Rev 9 ...
Page 170: ...Maintenance 12 Recovering the HDD 160 RC420 Rev 9 ...