3 Installation
3.4 Power bus
Rapid Link 5 · RAMO5 · RASP5
10/19 MN034004EN
www.eaton.com
85
3.4.1.2 End-pieces and lead-throughs
Once the flexible busbar has been routed, all free busbar ends must be safely
terminated and sealed as required to achieve an IP65 degree of protection.
To do this, use cable end pieces (RA-C1-END1) and bushings (RA-C1-DF) as
necessary.
Figure 49: Bushing RA-C1-DF for ribbon cable
With bushing RA-C1-DF the flexible busbar can be fed into distribution
module RA-C1-VM-7 or a control panel.
▶
Cut the busbar to the required length.
Figure 50: RA-C1-CUT hand ribbon cable cutter
▶
Strip the flexible busbar to the required length:
•
For cable end piece to 19 mm,
•
With distributor module at 50 mm,
•
for control panel as required.
Figure 51: RA-C1-AZ-4
→
For cutting to length we recommend tool RA-C1-CUT.
→
Tool RA-C1-AZ-4 is recommended for stripping 7 x 4 mm
2
flexi-
ble bus bar.
If using a standard cable stripping knife, make sure not to cut
into the rubber jacket by more than 0.7 mm in order to avoid
damaging the conductor's insulation.
Summary of Contents for Rapid Link RAMO5
Page 1: ...Manual Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN ...
Page 4: ...II ...
Page 10: ...6 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Page 122: ...4 Operation 4 3 Manual control 118 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Page 158: ...8 PC tool 8 2 Parameter Editor 154 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Page 208: ...11 Communications 11 5 OP Bus 204 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...