3 Installation
3.2 Installation instructions
76
Rapid Link 5 · RAMO5 · RASP5
10/19 MN034004EN
www.eaton.com
3.2.2 Free space
Figure 39: Clearances for thermal air cooling (example: RASP5)
Depending on the version, thermal clearances must be provided around the
RAMO5 and RASP5 Rapid Link modules. On versions with a repair and mainte-
nance switch (RAMO5-…-...RS1 and RASP5-…-...R…S1) or in the area of the
pluggable cable connections
②
, these must also provide unobstructed handling.
The table below lists the recommended minimum clearances.
Job descrip-
tion
Instance
RAMO5
Clear Zone
RASP5
Clear Zone
mm
mm
①
top
• without repair and maintenance switch
25
100
• with repair and maintenance switch
~150
~150
②
bottom
• without power connection
25
100
• with power connection
~100
~100
③
front
• without fan
15
25
• with fan
–
50
④
lateral
• without repair and maintenance switch
~0
1)
~0
1)
• with repair and maintenance switch
~150
~150
• without power connection
~0
1)
~0
1)
• with power connection
~100
~100
1) No lateral clearance is required up to 1000 m and up to an ambient temperature of +40 °C.
Higher ambient temperatures (up to a maximum of +50 °C), Pulse frequencies f
PWM
up to a maximum of 16 kHz
and installation heights up to 2000 m require a lateral distance of at least 20 mm.
→
Devices with high magnetic fields (e. g. reactors or transform-
ers) should not be mounted close to the RAMO5 or RASP5.
a
b
c
d
d
Summary of Contents for Rapid Link RAMO5
Page 1: ...Manual Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN ...
Page 4: ...II ...
Page 10: ...6 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Page 122: ...4 Operation 4 3 Manual control 118 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Page 158: ...8 PC tool 8 2 Parameter Editor 154 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...
Page 208: ...11 Communications 11 5 OP Bus 204 Rapid Link 5 RAMO5 RASP5 10 19 MN034004EN www eaton com ...