32
Step 4
Supply power to the switch.
A.
Connect one end of the power cable to the switch.
B.
Connect the power cube end of the power cable to a standard wall outlet.
When the switch receives power, the Power LED should remain solid Green.
2.2.3 Rack-Mounting
The following procedure describes how to install the switch in a standard 19-inch rack.
z
Disconnect all cables from the switch.
z
Remove all adhesive pads from the bottom of the switch.
Step 1
Place the switch right side up on a hard flat surface, with the front panel facing you.
Step 2
Locate a mounting bracket over the mounting holes on one side of the switch
Step 3
Insert three screws and use a screwdriver to secure.
Step 4
Repeat the two previous steps for the other side of the switch.
Step 5
Insert the switch into the 19-inch rack and secure with suitable screws. Make sure
the ventilation holes on the switch are not obstructed.
Step 6
Connect the network cable and supply power to the switch.
Figure 1
Locating a Mounting Bracket
2.2.4 Power-On Self Test (POST)
When you power-on the switch, it performs its Power-On Self Test (POST). During the
POST, the switch CPU:
z
Performs a series of diagnostic procedures to make sure the basic system is functioning
Summary of Contents for DN-80233
Page 1: ...User Manual Dynamic 24 PORT MANAGED GIGABIT SWITCH DN 80233 ...
Page 25: ...24 ...
Page 28: ...27 ...
Page 29: ...28 ...
Page 30: ...29 ...
Page 31: ...30 ...
Page 149: ...148 Default 0 Format vlan priority priority Mode Interface Config ...
Page 224: ...223 Mode Class Map Config ...