Chapter 12 Troubleshooting
12
CAN1 (CANopen) LED
RUN LED
LED state
Explanation
How to deal with
Green light
single flash
CAN1 (CANopen)
communication port is in
STOP state.
PC is downloading the network configuration data.
Wait till downloading is completed.
Green light
blinking
CAN1 (CANopen)
communication port is in
Preoperational state.
1. Check if CANopen network bus cable connection
is correct.
2. Check if the CANopen bus cable is Delta
standard CANopen cable.
3. Check if the two ends of the CANopen bus have
connected a terminal resistor respectively.
4. Check if the baud rate of the master is the same
as that of other slaves.
5. Check if configured slaves have been actually
connected to the network.
6. Check if some slave can not make the
connection with the master.
7. Check if some slave is offline.
Green light
ON
CAN1 (CANopen)
communication port is in
RUN state.
No correction
RUN LED: Green light is in single flash and blinks as below.
ERR LED
LED state
Explanation
How to deal with
LED OFF
PLC module is in the state of
normal work.
No correction
Red light double
flashes
Some slave is offline.
1. Check if the CANopen bus cable is Delta
standard cable.
2. Check if the two ends of CANopen bus have
connected a terminal resistor respectively.
3. Check if configured slaves have been
actually connected to the network.
O N
O FF
Gr ee n li gh t
sin gl e flash
200ms
2 00ms
1000 ms
O N
O F F
Gr ee n l ig ht
bl in ks
20 0ms
200 ms
12-3
Summary of Contents for DVP15MC11T
Page 9: ...Memo viii...
Page 15: ...DVP15MC11T Operation Manual _2 MEMO 2 4...
Page 71: ...DVP15MC11T Operation Manual _7 Memo 7 10...
Page 81: ...DVP15MC11T Operation Manual _8 Timing Chart F_TRG_CLK F_TRG_Q 8 10...
Page 158: ...Chapter 8 Logic Instructions 8_ The program 1 ASIN EN ENO In Out ASIN_EN ASIN_In Out1 8 87...
Page 249: ...DVP15MC11T Operation Manual _8 8 178...
Page 285: ...DVP15MC11T Operation Manual _8 Memo 8 214...
Page 323: ...DVP15MC11T Operation Manual 10 MEMO 10 34...
Page 549: ...DVP15MC11T Operation Manual A MEMO A 16...