![background image](http://html.mh-extra.com/html/daikin/3mks50dvm/3mks50dvm_service-manual_501112155.webp)
Instruction
Si12-619A
142
Operation Manual
2.1.4 Preparation Before Operation
Preparation Before Operation
To set the batteries
1. Slide the front cover to take it off.
2. Set two dry batteries (AAA).
3. Set the front cover as before.
ATTENTION
About batteries
• When replacing the batteries, use batteries of the same type, and replace the two old batteries
together.
• When the system is not used for a long time, take the batteries out.
• We recommend replacing once a year, although if the remote controller display begins to fade or if
reception deteriorates, please replace with new alkali batteries. Do not use manganese batteries.
• The attached batteries are provided for the initial use of the system.
The usable period of the batteries may be short depending on the manufactured date of the air
conditioner.
+
–
–
+
2
3
1
Position + and
– correctly!
Summary of Contents for 3MKS50DVM
Page 13: ...Introduction Si12 619A xii ...
Page 131: ...Control Specification Si12 619A 118 Function and Control ...
Page 213: ...Instruction Si12 619A 200 Operation Manual ...
Page 283: ...Check Si12 619A 270 Service Diagnosis ...
Page 302: ...Si12 619A Outdoor Unit E Series 50 52 58 Class Removal Procedure 289 Step Procedure Points ...
Page 385: ...Wiring Diagrams Si12 619A 372 Appendix FTK X S50 60 71FVLT ...
Page 399: ...Si12 619A vi Index ...