6
Regular Maintenance
CPI Canada Inc.
Use and disclosure is subject to the restrictions on the title page of this CPI document.
Page 6-2
CMP 200
®
X-Ray Generator Service Manual Ch # 901476-08 Rev. B
6.1.0 INTRODUCTION
This chapter provides a recommended schedule for periodic maintenance of the CMP 200
®
series and the
CMP 200
®
DR series of X-ray generators.
The initial installation date and location, and all service performed on the generator, should be
recorded in table 6-1. The record should be as thorough as possible, detailing the scope and type of work that
was performed (all service and a record of all replacement parts that were installed). Additionally, the person
performing the work should date and sign the record.
This information will be invaluable in the future for traceability and to ensure continued compatibility of
the generator.
If a major component (such as the HT oil tank or a major circuit board) is replaced, recalibration will be
needed. A separate procedure will be included with the spare in those cases, detailing the required
calibration procedure. The acceptance test procedure per Chapter 4 should then be performed prior to
placing the generator back into service.
WARNING:
MAINTENANCE IS TO BE PERFORMED ONLY BY COMPETENT, TRAINED PERSONNEL
WHO ARE FAMILIAR WITH THE POTENTIAL HAZARDS ASSOCIATED WITH THIS
EQUIPMENT.
NOTE:
MAINTENANCE SCHEDULE FREQUENCY MAY BE DICTATED BY CERTAIN
REGULATORY REQUIREMENTS OF THE COUNTRY OR STATE IN WHICH THE
INSTALLATION IS LOCATED. ALWAYS CHECK THE LOCAL CODES AND
REGULATIONS WHEN SETTING THE MAINTENANCE SCHEDULE.
WARNING:
ALWAYS SWITCH OFF MAINS POWER TO THE GENERATOR AND WAIT A MINIMUM OF
5 MINUTES FOR CAPACITORS TO DISCHARGE BEFORE BEGINNING ANY
PREVENTATIVE MAINTENANCE, INCLUDING CLEANING.