1
Pre-installation
CPI Canada Inc.
Use and disclosure is subject to the restrictions on the title page of this CPI document.
Page 1-24
CMP 200
®
X-Ray Generator Service Manual Ch # 901476-01 Rev. C
1.3.7 Pre-Installation
Checklist
Before starting the generator installation, review the following checklist.
CHECK
√
DESCRIPTION
Is there an unloading area to transport the generator from the delivery truck to
the inside of the building?
If the installation is not on the same floor as the delivery entrance, is there an
elevator available?
Is there a transport dolly or similar device to move the generator?
Do any regulatory bodies need to be notified prior to installation?
If movers are required, have arrangements for time and equipment been
completed?
Are lifting straps or some other suitable device available to lift the generator off
the shipping pallet?
1.4.0
GENERATOR LAYOUT AND MAJOR COMPONENTS
Figure 1-3 shows the external view and dimensions of the membrane and touchscreen operator’s
consoles. Figures 1-4 and 1-5 show the major components located inside the generator cabinet. Figure
1-6 is an internal view of the console, showing the major components and cabling. Figure 1-4 does not
represent all models. This is meant to show major component layout only.
Figure 1-4: Major generator subassemblies view 1