High Wall Model Installation Instructions
PRECISION MICROSCOPES
SEILER IQ
ENT
Page 1: ...High Wall Model Installation Instructions PRECISION MICROSCOPES SEILER IQ ENT ...
Page 2: ... S arm assembly from the shipping carton and connect this assembly to the bottom of the wall bracket by carefully threading the shaft into the wall bracket using the gray cap on the S arm assembly to thread in the shaft 4 Two holes are used to insert a tool for loading the internal bearings One hole contains a setscrew which you can adjust to lock the desired tension 5 After the entire microscope ...
Page 3: ...SEILER IQ High Wall Mount CEILING FLOOR CEILING TO FLOOR 8 FEET 18 HOLE 10 23 5 6 14 19 5 25 24 VERTICAL MOVEMENT wƒ 250mm 10 ...
Page 4: ...Positioning ...
Page 5: ......
Page 6: ... materials A bolt is surrounded by a cylindrical metal sleeve They operate by the expansion of the sleeve into the base material when one tightens the bolt Ex panding the sleeve along the length of the anchor enables a larger bearing surface than that offered by the wedge anchor and can better adhere to irregular surfaces within the base material than can the wedge anchor Therefore sleeve anchors ...
Page 7: ...oducts or services please feel free to contact us MEDICAL DIVISION Mint Devices Australia Pty Ltd PO Box 290 Potts Point NSW 2011 info mintdevices com au www mintdevices com au 61 2 8090 0994 info seilermicroscopes com au www seilermicroscopes com au www mintdevices com au ...