Preparing for Installation
The Carousel Plus W Series Dryer is easy to install if you plan the location and prepare the
mounting area properly.
Make sure the mounting area provides:
❒
A grounded power source supplying the voltage and correct current
for your dryer
model. Check the dryer’s serial tag (on the control box) for the correct amps, voltage, phase
and cycles. Field wiring should be completed by a qualified personnel to the planned location
for the dryer. All electrical wiring should comply with your region’s electrical codes.
❒
A source of water, when using the aftercooler and/or precooler.
The W Dryer’s aftercool-
er and/or precooler require tower, city, or chiller water at temperatures of 45° to 85°F {7° to
29°C}.
See Description section entitled, Specifications: Carousel Plus W Series
Dehumidifying Dryers.
Piping should be run to the planned dryer location. Use flexible hose
to connect the water pipes to the aftercooler/intercooler and/or optional precooler.
❒
Minimum clearance for safe operation and maintenance.
You should maintain 24 in. {61
cm} clearance on all sides of the dryer.
TIP:
If you plan to
use vacuum or com-
pressed air loaders
to fill the hopper,
install conveying
lines to the drying
hopper location.
✒
NOTE:
The aftercooler
reduces the tempera-
ture of air returning
from the drying hop-
per, improving the
efficiency of the des-
iccant.
✐
I n s t a l l a t i o n l
3-3
19.75 inches
{50.17 cm}
28.25 inches
{71.76 cm}
27.88 inches
{70.82 cm}
AFTERCOOLER
DEMISTER
DELIVERY AIR
FILTER
W600-1000 minimum clearance
requirements (top view)
DEMISTER
AFTERCOOLER
DELIVERY AIR
FILTER
30.03 inches {72.28 cm}
{61.93 cm}
24.38 inches
28.38 inches {72.09 cm}
W1300-2400 minimum clearance
requirements (top view)
28.94 inches
{73.51 cm}
35.44 inches {90.02 cm}
34.25 inches {87.00 cm}
AFTERCOOLER
DEMISTER
DELIVERY AIR
FILTER
W3200-5000 minimum clearance
requirements (top view)
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...