3
Installa
tion
I n s t a l l a t i o n - Te s t i n g l
3-19
Testing the Primar y Receiver
(optional)
(continued)
7
Press the “Enable” button on the Primary Hopper Loader Screen to acti-
vate the primary receiver.
If everything is installed correctly:
•
The vacuum pump will turn on for the duration of the load time set at
this screen.
•
The flap valve of the receiver will open at the end of the load cycle
time for the duration of the dump time set at this screen.
•
The purge valve will purge the conveying line leaving the drying
hopper (if purge is used).
8
Press the “Disable” button on the Primary Hopper Loader Screen to
deactivate the primary receiver.
If everything is installed correctly:
•
The vacuum pump will turn off
•
The flap valve of the receiver will close
•
The purge valve will deactivate
9
After the test has been completed successfully,
properly shut down the
dryer,
see Operation section entitled, Stopping the Dryer.
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...