A p p e n d i x l
B-5
Using Pull Ring Connections
The following are general usage instructions for pull-ring connections with U-shaped seals.
This is the primary style of connection used with Conair hard pipe kits.
1
Pull the U-shaped seal around one of the pipe flanges.
The seal can be
stretched to fit, but avoid overstretching.
2
Make sure that the “tooth” side of the U-shaped seal will face the pipe section
that will be connected to this one.
3
Place the next section (counter-pipe) into position and push one half of the
clamping ring onto the pipe flange.
Make sure that the pipes are aligned square-
ly and that the seals are not displaced.
4
Completely separate the two sections of the pull ring to be used.
5
Connect the two sections of the pull ring around the flange, loosely tighten
using the bolts using your fingers.
Make sure that the pull ring is alligned
around the entire flange. Make sure that the u-shaped seal is aligned and not pro-
truding from the pull ring in any location.
6
Tighten, alternating from one bolt to the other, the bolts to clamp the pull
ring around the flange.
Use a 6 mm hexagon screwdriver and tighten the bolt to
a maximum torque of 25 Nm.
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...