4-46
l O p e r a t i o n
Starting the Dr yer
(continued)
5
Navigate to the System Control Screen
after all set points have be entered.
6
Press the “Start System” button
to begin pre-drying your material.
7
Start the processing machine,
after the normal pre-dry time is complete
(approximately 4 to 6 hours). The processing machine can now begin taking
material out of the hopper. As the system is running, it will take several hours
for all components to reach a steady-state running condition. Conair recom-
mends waiting until the system is in a constant steady state before making any
changes to temperature.
(continued)
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...