5-2
l M a i n t e n a n c e
Preventative Maintenance Checklist
Routine maintenance will ensure optimum operation and performance of the W Series
Carousel Plus Dryer. We recommend the following maintenance schedule and tasks.
• Whenever you change materials
❒
Drain and clean the hopper.
See Maintenance section entitled,
Cleaning the Hopper.
• Weekly, or as often as needed
❒
Clean or replace the process and regeneration filters.
You may need to clean filters more often than weekly. Frequency depends on how
much material you process and how dusty or full of fines it is
See Maintenance sections entitled, Cleaning the Process Filter and
Cleaning the Regeneration Filter.
❒
Inspect hoses and hose connections.
Check for damage, kinks, or loose hose clamps. Replace any hoses that
show signs of damage or wear. Reposition and tighten loose hose clamps.
See Maintenance section entitled, Inspecting Hoses and Gaskets.
❒
If equipped - Open volatile drain valve to remove volatiles and residue that
may have accumulated.
Place a bucket or pail below the drain for the volatiles to
drain into. Depending on your application, draining may need to be done more or
less frequently.
See Maintenance section entitled, Draining Volatiles.
• Monthly
❒
Clean the aftercooler and/or optional precooler coils and
the volatile trap.
You may need to clean the coils more often than
monthly. Frequency will depend on the type and volume of material you
process.
See Maintenance sections entitled, Cleaning the Aftercooler Coils,
Cleaning the Precooler Coils and Cleaning the Volatile Trap.
(continued)
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...