6-38
l Tr o u b l e s h o o t i n g
Replacing the Desiccant Wheel
Assembly
(W600 - 1000)
(continued)
10
Lift the new desiccant wheel into the dryer frame, being sure it is oriented
properly.
To verify the correct orientation, ensure that the regeneration air inlet is
positioned closest to the regeneration heater tube.
DO NOT
bolt into place at this
time.
11
Lift the aftercooler assembly into the dryer frame and bolt it to the frame using the
four bolts you removed earlier.
12
Verify position of the desiccant wheel assembly and bolt it in place.
13
If the aftercooler is being used, reconnect the water lines.
14
Reconnect or reinstall all hoses, RTDs, and wiring connections.
15
Bolt the top cover in place.
16
Connect the power to the dryer and start it.
Ensure that the desiccant wheel
assembly rotates in the correct direction.
17
Replace all upper and lower side panels.
NOTE:
If your dryer is configured with a hard pipe kit, re-connect the hard piping to the top of the
dryer at this time.
✐
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...