Replacing the Regeneration Heater
(W600 - 1000)
(continued)
8
Compare the markings on the outside of the regeneration heater tube
to ensure the new one
has the same voltage and kW ratings as the original heater tube. This information is on the end
nearest the wires.
9
Slide the original insulation over the new heater
or, if the insulation was cut for removal, wrap
the cut insulation sleeve around the new heater tube and secure it with duct tape.
10
Make sure the cable end of the heater
tube is to the bottom then secure the
new heater tube to the mounting
bracket with a hose clamp.
11
Connect the hoses to the top and bot-
tom of the heater tube
and secure them
with hose clamps.
12
Connect the high temperature switch
wires
to the quick disconnects near the
heater tube.
13
Route the heater power cable into the
control cabinet and connect the leads
to the original locations on the termi-
nal block.
Refer to the wiring diagram
for specific connection information.
14
Replace the side panel(s) of the dryer.
15
Measure the resistance from each leg
of the heater tube to the others and
from each leg to ground.
There should
be +/- 5% resistance variation between all 3 legs, and high resistance from each leg to ground.
16
Connect the dryer to power and turn it on.
Verify that the regeneration temperature achieves
the setpoint.
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...