Proper Location and use of Hanger,
Clamp, and All-thread
Your Conair Hard Pipe Kit comes with a quantity of tubing hangers (varies depending on
which kit you order) for supporting the weight of the horizontal and vertical spans, specifi-
cally spans that use slip tube sections. A hanger should be placed on either side of any
location where a slip tube was used. This includes supporting a vertical section where a
slip tube was used by utilizing a hanger at the closest horizontal location to support the
vertical section.
Proper hanging method uses:
• Ceiling mount clamp with rubber insert
• Threaded rod adapter
• M-10 bolt
•
Proper length of all-thread - 3/8” tip and proper connection to approved load carrying
structure
B-10
l A p p e n d i x
Slip Tube
Slip Tube
Hanger
Hanger
Hanger
Hanger
NOTE:
T1
✠
440 lbs. {195.58 kg}
at 0.2 in. {5.08 mm} deflection.
✐
NOTE:
Always follow all local
and regional building codes
when installing.
✐
NOTE:
Conair recommends the
use of hangers at 10 ft. {3.05 m}
intervals at minimum for appro-
priate support.
✐
Channel or other structural
support as reqd.
All thread 3/8”
Typ.
Threaded
rod adapter
M-10 bolt
!
T1
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...