4-30
l O p e r a t i o n
Control Function Descriptions
(continued)
Secondary Hopper Loader Screen (optional)
To access the Secondary Hopper Loader Screen:
1
Press the "Secondary Loader" button
located on the right side of the screen.
The Secondary Hopper Loader screen allows the user to set the load time, dump time,
purge time and alarm checks of the optional receiver. If the user is logged-in at the
proper security level, these settings can be changed from this screen.
See specific
receiver’s manual for correct settings of these parameters.
Once the correct times
have been entered, press the “Enabled” button to activate the optional secondary
receiver. Pressing the “Disabled” button will de-activate the receiver. The receiver’s
current status will be displayed under the receiver’s icon in the top left side of this
screen.
The user can also view the other system parameters, start the system, stop the system,
initiate a system cooldown or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper securi-
ty level, by pressing the set point
boxes. This will launch a pop-up
keypad window that can be used
to change the set point.
See
Operation section entitled,
Example Set Point Change.
After
the new set point value has been
entered, press the
"Enter"
key to
lock in the new set point.
✐
(continued)
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...