4-40
l O p e r a t i o n
Control Function Descriptions
(continued)
Secondary Hopper Loader Setup Screen (optional)
To access the Secondary Hopper Loader Setup Screen:
1
Press the "Loader” button
located in the bottom left side and under the heading
“Secondary” of the Equipment Setup Screen.
The Secondary Hopper Loader Setup screen allows the user to enable or disable the
optional receiver and to choose the type of valve working with the receiver.
To select the type of valve:
1
Use the drop down arrow to make the selection.
The user can view the main system screens by pressing the login button on the bottom-
right of the screen.
(continued)
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...