Control Function Descriptions
(continued)
Primary Hopper Loader Screen (optional)
To access the Primary Hopper Loader Screen:
1
Press the Magnifying Glass icon button
associated with the optional receiver in
the dehumidifying drying circuit on System Overview Screen or the
Dehumidifying Drying Screen.
The Primary Hopper Loader screen allows the user set the load time, dump time,
purge time and alarm checks of the receiver. If the user is logged-in at the proper
security level, these settings can be changed from this screen.
See specific receiver’s
manual for correct settings of these parameters.
Once the correct times have been
entered, press the “Enabled” button to activate the primary receiver. Pressing the
“Disabled” button will de-activate the receiver. The receiver’s current status will be
displayed under the receiver’s icon in the top left side of this screen.
The user can also view the other system parameters, start the system, stop the system,
initiate a system cooldown or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are
white with heavy black borders.
Set points can be changed, if the
user has logged in at the proper
security level, by pressing the
set point boxes. This will launch
a pop-up keypad window that
can be used to change the set
point.
See Operation section
entitled, Example Set Point
Change.
After the new set point
value has been entered, press
the
"Enter"
key to lock in the
new set point.
✐
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...