B-4
l A p p e n d i x
Preparing for installation
Your plant layout and drying system component positioning will determine the organization
of pieces necessary to complete the piping between the dryer and hopper. Each application
will vary. Conair recommends that you take the following steps before starting installation.
1
Organize all like pieces.
Place all clamps together,
all straight sections togeth-
er, all elbows together, etc.
2
Start by laying the pieces
out between the dryer
and the hopper.
If you
ordered your hard pipe kit
as part of a Conair system,
a system drawing may have
been included that will
indicate pipe position and
suggested layout.
3
Visually inspect to make
sure that the pieces you have will meet the
needs of your system.
If it looks like you will
need additional pieces to complete your sys-
tem, contact Conair Parts and Service. You
can order individual pieces as necessary to
complete your system.
4
If your drying system has been in use, wait
until all components have cooled prior to
attempting any installation steps.
(Continued)
For more information about
adding a Conair Hard Pipe
Kit to your drying system,
contact Conair.
Conair’s sales number is
724-584-5500.
Conair’s Instant Access
24/7 Parts and Service
number is 800-458-1960.
Outside the U.S., dial
814-437-6861.
CAUTION: Hot surfaces.
Always protect yourself from hot surfaces inside and outside the
dryer and drying hopper.
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...