6-34
l Tr o u b l e s h o o t i n g
Replacing the Regeneration Heater
(W1300 - 2400)
(continued)
8
Slide the original insulation over the new heater,
or if the insulation was cut for removal,
wrap the cut insulation sleeve around the new heater tube and secure it with heat tape.
9
Make sure the cable end of the new heater tube is to the bottom, then connect the hoses to
the top and bottom of the heater tube
and secure with pressure clamps and the lower heater
tube bracket that was removed in Step 5.
10
Connect the high temperature switch cable to the quick disconnect.
11
Route the heater power wires into the junction box, and connect them to the supply leads
from the control box.
Refer to the wiring diagram for specific connection information.
12
To ensure all connections are correct, measure the resistance as in Step 3.
You should meas-
ure the readings as noted for a good heater.
13
Close the side panel of the dryer.
14
Connect the dryer to power and turn it on.
Verify the regeneration temperature achieves the
setpoint.
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...