4
Opera
tion
O p e r a t i o n l
4-45
Starting the Dr yer
To start the dryer:
1
Turn on the main power to the dryer and system components.
Check
to ensure that the all disconnect dials are in the "On" or “
I
” position.
2
Fill the drying hopper with material
by navigating the System Overview
Screen and pressing the optional receiver's magnifying glass icon. Once at the
Primary Loader Screen, set the receiver’s load time, dump time and purge
times and press the “Enable” button to start loading the CH Hopper.
2b
If you are not using the optional loading function, fill the drying hopper
with material.
3
Navigate to the Process Heater: Dehumidified Air Circuit Screen
within the dryer’s control.
4
Enter the Pre-dry Delivery Air Temperature that is to be used with your
material.
Pre-drying temperatures are specific to the type of material that is
processed, consult your material supplier for recommended pre-drying
temperatures.
(continued)
NOTE:
Screen 3 shows the type of
heater installed in the Dehumidifying
Drying Circuit of the Carousel Plus
Dryer System. If a GasTrac has been
installed, the image on the screen will
reflect a gas heater (flame). If an HTC
has been installed, the image on the
screen will reflect an electric heater
(heating coil). The screen used in this
example reflects an electric heater
(heating coil).
✐
NOTE:
Set points boxes are white with
heavy black borders. Set points can
be changed, if the user has logged in
at the proper security level, by press-
ing the set point boxes. This will
launch a pop-up keypad window that
can be used to change the set point.
See Operation section entitled,
Example Set Point Change.
After the
new set point value has been entered,
press the
"Enter"
key to lock in the
new set point.
✐
OFF
O
ON
I
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...