B-8
l A p p e n d i x
Adding Turns/Bends
Once you have assembled your verticle section above the dryer, you will need to add the
90
°
bend to continue horizontally. A slip tube may need to be used as part of the last section
before the turn to horizontal to fit your plant/system layout.
Refer to Using Slip Tubes earli-
er in these instructions
for more information about using slip tubes for more flexibility with
your hard pipe kit.
1
Verify that when you add your bend or turn, you will be at your desired height for
the horizontal run of your hard piping.
It may be necessary to utilize a slip tube to
complete your vertical pipe section at the correct height.
2
Place the u-shaped
gasket seal on the
top of the pipe end.
3
Place the bend on top of the pipe end.
4
Use the bolted ring to connect the bend to the pipe.
5
Tighten the bolted pull ring bolt to a maximum
torque of 25 Nm.
Be sure to alternate tightening bolts
from one side to another so that the pull ring clamps
securely and evenly around the pipe flange.
To order a slip tube or
other parts for your
hard pipe kit, Conair’s
Instant Access 24/7
Parts and Service
number is
800-458-1960.
Outside the U.S., dial
814-437-6861.
NOTE:
Slip tube connections
must be secured against dis-
placement. For horizontally
installed tubing, tubes must be
supported in the area of the slip
connection to prevent sagging.
✐
IMPORTANT:
Slip tubes are not
meant to be used as telescop-
ing tubes. They are not
designed to be adjusted during
operation.
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...