Testing the Installation
3
From the System Control Screen, press the “Start System”
button.
If everything is installed correctly:
•
The regeneration and process blowers turn on.
•
The regeneration heater turns on.
•
The process heater will energize (Heater Pack).
•
The dryer’s desiccant wheel starts turning. If the desiccant wheel does
not turn, verify that the desiccant wheel tie has been removed.
4
From the System Control Screen, press the “Stop System”
button.
If everything is installed correctly:
•
The blowers will continue running as needed to cool the heaters.
(until regeneration heaters are less than 150°F {66°C}).
5
The test is over.
If the dryer performed the normal operating sequences as
outlined, reconnect the material source to the optional hopper receiver and begin
normal operation. If it did not,
refer to the
Troubleshooting
section of the User
Guide
.
Summary of Contents for Carousel Plus UGD043-1216
Page 7: ...Table of Contents l v...
Page 8: ...vi l Table of Contents...
Page 48: ...3 24 l Installation Testing...
Page 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Page 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Page 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Page 58: ...4 10 l Operation...
Page 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Page 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Page 62: ...4 14 l Operation...
Page 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Page 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Page 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Page 164: ...6 46 l Troubleshooting...