
9
9
9-78
9-78
Installation■>■Voice■Operation■Kit■C2■>■Installation■Procedure
Installation■>■Voice■Operation■Kit■C2■>■Installation■Procedure
9)■Install■the■Voice■Operation■Board■Unit■in■the■Main■Controller■Roller■PCB■1.
•■ 1■Connector
•■ 2■screws■(2■Screws■that■removed■in■step■8))
•■ 2■Screws■(TP;■M3x6)
NOTE:
Make■sure■that■the■connector■
is■properly■installed.
x4
Connector
F-9-158
10)■Install■the■Main■Controller■PCB■1■to■the■host■machine.
CAUTION:■
Lift■the■handle,■insert■the■Main■
Controller■PCB■1■until■it■stops,■tilt■
the■grip■and■install■the■2■screws.
Make■sure■to■tilt■the■grip■slowly■on■
both■sides■simultaneously.
Check■that■the■Main■Controller■
PCB■1■is■installed■properly.■
Grip
x2
F-9-159