
9
9
9-60
9-60
Installation■>■Cassette■Heater■Unit-32■>■Installation■Procedure
Installation■>■Cassette■Heater■Unit-32■>■Installation■Procedure
12
12)■Install■the■supplied■AC■input■connector■in■two■steps([A]■>■[B]).
Install■the■ground■cable■using■a■screw■with■toothed■washer.
[B]
[A]
x1
F-9-116
13)■Install■the■relay■harness■unit■to■the■rear■side■panel■of■the■paper■deck■using■the■two■screws■(M4X8),■
and■then■connect■the■connector.
x2
F-9-117
14)■Wind■the■relay■harness■(one■and■half■turns)■around■the■cable■guides■on■the■power■
cord■mount,■and■then■connect■the■connector.
F-9-118
15)■Reattach■the■exterior■covers■of■the■paper■
deck■in■the■following■sequence:
[1]■Top■cover■(Take■care■not■to■have■cables■
caught.)■(M4X8:■2■pcs.)
[2]■Front-upper■cover■(Insert■the■connector.)
(M4X8:■3■pcs.)
[3]■Rear■cover■(M3X8:■2■pcs.,■M4X8:■4■pcs.)
[4]■Right■cover■(M4X8:■3■pcs.)
16)■Manually■slide■the■paper■deck■to■
the■left■to■place■it■aside■of■the■host■
machine.