90
The following steps are for machines equipped with the
Air Cleanout Kit.
1. Open the all ball valves and allow water to drain out
of the Bottom Fill Valve. Open the drain cock in the
Pump and in the Flow Meter Drain. See Fig. 5.19.
2. Close the Tank Shutoff Valve and the valve to the
Fresh Water Tank (if equipped).
3. Install the Air Valve onto the Bottom Fill Valve. See
Fig. 5.18.
F
IG
. 5.18 A
IR
V
ALVE
Pump
Bottom Fill Valve
Pump Shutoff Valve
Tank Shutoff Valve
Filter
Agitator Valve
Throttling Valve
Transfer Valve
Main Tank Sump
Jet Agitators
Flow Meter
Flow Meter Drain
Electric Ball Valves
F
IG
. 5.19 P
LUMBING
L
AYOUT
Main Supply Hose
Summary of Contents for SB4000
Page 1: ...SB4000 SUSPENDED BOOM SPRAYER Part No B012920 Rev 14 Effective Mar 2009 OPERATORS MANUAL...
Page 5: ......
Page 107: ...96...
Page 136: ...125 8 SPECIFICATIONS FIG 8 1 MACHINE DIMENSIONS FOR SB4000 SPRAYER TRANSPORT POSITION...
Page 137: ...126 FIG 8 2 MACHINE DIMENSIONS FOR SB4000 SPRAYER FIELD POSITION...
Page 144: ...133 Notes...