![battioni Pagani BALLAST 11000 Instruction Manual For Use And Maintenance Download Page 54](http://html1.mh-extra.com/html/battioni-pagani/ballast-11000/ballast-11000_instruction-manual-for-use-and-maintenance_2708428054.webp)
user and maintenance
instruction manual BALLAST series
p. 36
INSTRUCTIONS FOR USE AND MAINTENANCE
2 - PACKAGING, STORAGE, HANDLING AND TRANSPORTATION
2.1 PACKAGING
The rotary blades vacuum pumps are supplied without packaging. On request the following packaging can be used:
•
wooden base and shrink-wrap;
•
wooden crates and shrink-wrap for shipment by sea or air;
2.2 STORAGE
In order to preserve the rotary blades vacuum pump correctly, it must be stored:
•
under cover, sheltered from adverse weather conditions;
•
resting horizontally on its four feet.
The rotary blades vacuum pumps are lubricated during testing at our factory with special oil that ensures lubrication of the
various internal components for approx. 6 months. In the event of subsequent storage it is advisable to wash the inside of the
body with oil and diesel oil (as stated in this manual).
2.3 HANDLING AND TRANSPORT
To view the data concerning the mass of the BALLAST pump see the technical annexes.
only be moved using equipment with adequate load and range capacity.
Slung through metal hooks to be inserted into the relevant grip holes, or sling; lifted by forklift truck (if on
pallet), bridge crane, crane or hoist.
If on pallets, loosen the screws holding the 4 feet of the BALLAST pump to the pallet.
For safety reasons, use a sling or chain to lift the pump,
together with the eyebolt.
Pass the sling or chain below the BALLAST pump, between the support feet
Hook the sling or chain to the lifting equipment.
The rotary blades vacuum pump is provided with protection in accordance
with the EC Directives in the part to be mounted by the installer
using the screws provided.
3 - ASSEMBLY, FITTING, INSTALLATION, DISASSEMBLY, RE-FITTING
The procedures concerning the rotary blades vacuum pump versions …/G and …/GA are provided in the
GARDA/GARDA EVOgroup manual.
All maintenance operations, inspections, checks and repairs should be carried out with the greatest care and with
the tractor not running and the power take-off disconnected.
It is essential to prevent sewage from entering the Rotary blades vacuum pumps.
The entrance of sewage would cause the blades and consequently the rotor to break.
It is therefore necessary to equip the system with an overflow valve, “3”, and a safety overflow valve, “2”, between
the rotary blades vacuum pump and the tank car
(see Figure 1)
When carrying out maintenance operations, inspections, checks or repairs it is advisable to wear the individual
protective devices listed in this manual.
In the case of pump painting do not paint the identification plate, taps, oil sight glass, the oil level dipstick or the
vent plugs.
Summary of Contents for BALLAST 11000
Page 244: ...226 BALLAST UNI EN ISO 12100 2010 2006 42 CE 2006 42 CE CE CE 8 1512 8...
Page 245: ...227 BALLAST 2006 42 CE ATTENZIONE ORGANI IN MOVIMENTO PERICOLO ATTENZIONE ALLE MANI...
Page 250: ...BALLAST 232 2 2 1 2 2 6 2 3 BALLAST BALLAST 4 BALLAST CE 3 G GA GARDA GARDA EVO 3 2 1...
Page 259: ...241 BALLAST 3 8 6 BALLAST 16000 1 2 3 4 5 4 180 6 Ballast...
Page 264: ...246 BALLAST 8 8 1 PTO 8 2 30 20 0 80 bar 1 bar 2 5 bar 1 5 bar C 2 bar 1 bar D 0 80 bar 10 C D...
Page 268: ...250 BALLAST 10 Ballast...
Page 269: ...251 BALLAST 11 200ml 20 100 11 1 11 1 1 11 1 2 11 1 3 11 2 11 3 11 3 1...
Page 271: ...253 BALLAST 11 4 M MA K KA 1 2 3 4 11 5 11 6 300 M MA K KA D Ballast 12...
Page 273: ...255 BALLAST CE 42 2006...
Page 278: ...BALLAST 260 2 2 1 2 2 6 2 3 BALLAST BALLAST BALLAST 3 G GA GARDA GARDA EVO 2 3 1...
Page 281: ...263 BALLAST 1 2 3 4 5 6 7 8 4 3 5 3 ISO DIN 22...
Page 287: ...269 BALLAST BALLAST 16000 1 2 3 4 5 4 SX DX 180 SX DX Ballast 3 8 6...
Page 292: ...274 BALLAST 8 8 1 Battion Pagani PTO 8 2 20 30 1 0 80 1 5 2 5 2 C 1 D 0 80 10 C D...
Page 296: ...278 BALLAST 10 Ballast...
Page 297: ...279 BALLAST 11 200 100 20 11 1 11 1 1 11 1 2 11 1 3 11 2 11 3 LONG LIFE 11 3 1 LONG LIFE...
Page 299: ...281 BALLAST M MA e K KA 11 4 1 2 3 4 11 5 11 6 300 D M MA K KA Ballast 12...