Commissioning • Installation
170
Automation PC 810 with GM45 CPU board user's manual V1.28
Chapter 3 • Commissioning
1 Installation
Devices are installed using the mounting plates found on the housing. These plates are designed for M5 screws.
9
ø 11
ø 5.4 compatible
For M5 screws
Figure 76: Mounting plates
The exact positioning of the mounting holes can be seen in the drilling templates in Chapter 2 "Technical data",
section "Individual components" on page 65.
1.1 Procedure
1. Drill the necessary holes in the control cabinet. The exact position of the mounting holes is illustrated in the
drilling templates.
2. Mount the B&R Industrial PC to the control cabinet using M5 screws.
1.2 Important mounting information
•
Environmental conditions must be taken into consideration.
•
This device must be mounted to a flat surface.
•
This device is only certified for operation in closed rooms.
•
This device must not be subjected to direct sunlight.
•
Ventilation holes must not be covered.
•
This device must be mounted in one of the approved orientations.
•
The wall or control cabinet must be able to withstand four times the total weight of the device.
•
The flex radius of connected cables (DVI, SDL, USB, etc.) must not be exceeded.