– Must be performed by a technician –
79
Installation
and Assembly
8A. Installation and Assembly
Test Mode
Troubleshooting
8A-3
Post-Installation Checks
Has the machine been installed in conformance with the installation conditions? (See “5-1 Installation
Conditions” on page 16.)
Are the power capacity conditions met?
Has the ground wire been installed?
Has the power cord been installed using cable molding or other means so that players and other customers
do not trip over it?
Are images projected over the entire dome screen (all the way to the edges)?
(See “8B-6-2 Adjusting the Projector Position” on page 155.)