8
Table of Contents
8. Technician’s Manual – Must be performed by a technician – ............................................................................................56
8A. Installation and Assembly ..................................................................................................................................................56
8A-1 Assembly
......................................................................................................................................................................56
8A-1-1 Assembling the Machine – Must be performed by a technician –
..................................................................56
8A-2 Power Supply and Other Connections and Preparations
.............................................................................................73
8A-2-1 Connecting the Power Cord and Ground
.......................................................................................................73
8A-2-2 Connecting the LAN Cable
............................................................................................................................75
8A-2-3 Turning the Power Switch On
........................................................................................................................77
8A-2-4 Setting the Maintenance Time
.......................................................................................................................78
8A-3 Post-Installation Checks
...............................................................................................................................................79
8A-4 Disassembly (When the Delivery Route has a Low Ceiling)
........................................................................................80
8A-4-1 Removing the Top Cover – Must be performed by a technician –
.................................................................80
8B. Service ..................................................................................................................................................................................83
8B-1 Inspection and Service
.................................................................................................................................................83
8B-1-1 Points for Inspection – Must be performed by a technician –
........................................................................83
8B-2 Troubleshooting
............................................................................................................................................................85
8B-2-1 Machine – Must be performed by a technician –
...........................................................................................85
8B-2-2 Projector Assembly – Must be performed by a technician –
..........................................................................86
8B-2-3 Throttle and Control Lever Assemblies – Must be performed by a technician –
............................................87
8B-2-4 Seat Assembly – Must be performed by a technician –
.................................................................................88
8B-3 Error Displays – Must be performed by a technician –
................................................................................................89
8B-4 Network Trouble
...........................................................................................................................................................91
8B-5 Removing and Installing Assemblies and Parts
...........................................................................................................92
8B-5-1 Machine – Must be performed by a technician –
...........................................................................................92
8B-6 Replacing and Adjusting the Projector Unit
................................................................................................................141
8B-6-1 Removing and Installing Each Part – Must be performed by a technician –
...............................................142
8B-6-2 Adjusting the Projector Position – Must be performed by a technician –
.....................................................155
8B-6-3 Various Projector Settings – Must be performed by a technician –
.............................................................159
8B-6-4 Projector Settings – Must be performed by a technician –
..........................................................................162
9. Disposal ................................................................................................................................................................................165
10. Parts List ...............................................................................................................................................................................166
10-1 Overall
........................................................................................................................................................................166
11. Wiring Diagram.....................................................................................................................................................................187
11-1 Overall Connection Diagram (U.S. Specifications, AC 120V)
.....................................................................................187
11-2 Overall Connection Diagram (European Specifications, AC 230V)
............................................................................190
11-3 Overall Connection Diagram (Asian specifications, AC 110 – 120, 220 – 240V)
........................................................193
Copyrights and Trademarks .......................................................................................................................................................197