– Must be performed by a technician –
– Must be performed by a technician –
130
8B. Service
Use the service key to open the bill validator door, disconnect the connector and two ground
wires from the bill validator, and push the harnesses into the coin box.
Push the harnesses into this hole.
Remove the bill validator box and install the supplied hole cover using the six supplied
countersunk nuts with washers (M8) in four locations inside the coin box and two locations on
the bottom surface of the base.
Countersunk nuts
with washer (M8)
Countersunk nuts
with washer (M8)
Hole cover
Close the coin door.