28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURES
3 - 2
3
VP - 6.5 Mixing Limit Sensor Check/Adjustment
VP - 7.1 Mixing Paddle Overcurrent Alarm
VP - 7.2 Mixing Paddle Overcurrent Alarm
VP - 8.1 Needle Sensors Check/Adjustment
VP - 9.1 Sample Wash Block Check/Adjustment
VP - 9.2 Vent Wash Block Check/Adjustment- (F
VP - 10.1 Tube Positioning Arm Check
VP - 10.2 Tube Positioning Arm Alignment
VP - 12.1 Blood In-Line Sensor Check/
VP - 13.1 Lead Bubble Check/Adjustment
VP - 14.1 Y-Axis Operation Check/Adjustment
VP - 15.1 Barcode Reader Configuration
Appendix 3 A - Sensors, LEDs and POTs
--- END ---