28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 3.15 Pusher Arm to Platen Adjustment
3 - 53
3
VP - 3.15 Pusher Arm to Platen Adjustment
Purpose: Perform this procedure to align the X-Axis Pusher Arms in the Platen Cutouts.
CAUTION:Do not remove Platen to perform this adjustment.
1. Perform Check procedure
“VP - 3.14 Pusher Arm to Platen Check” (Page 3-51)
2. Loosen 2 Pusher Arm mounting screws (1/2 turn), adjust pusher arm, tighten screws (
3. Loosen 2 screws at back of pusher head, adjust as required, and tighten screws.
4. Go to
“VP - 3.16 X-Axis Solenoid to Rack Guide Check” (Page 3-55)
.
Special Tools
DESCRIPTION
QTY
PN
None