28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 6.4 Mixing Contact Sensor Check/Adjustment
3 - 98
3
8. Verify Contact Sensor switching point.
All Loaders
a. Ensure Loader is in Manual Mode.
b. Press (
←
X) to move X-Axis Solenoids to left stop.
c. Insert Rack Guide Alignment Tool in right end of Platen with cutout facing up and to the left
).
d. Load Mixing Head Alignment in Position #4 of Rack and place Rack on left end of Platen
under the Tower.
e. Press (
→
X) to move Rack into cutout. Mixing Head Tool should be under Mixing Paddle (
).
f.
Press (Z
↓
) to drive Mix Paddle into Alignment Tool until Contact Sensor is blocked according
to
,
.
NOTE:Turn Z2 Motor Lead Screw with fingers to block Sensor accurately