28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 10.1 Tube Positioning Arm Check
3 - 134
3
8. If incorrect, perform
“VP - 10.2 Tube Positioning Arm Alignment” (Page 3-135)
.
Figure 3-72 Tube Positioning Arm Clearances
--- END ---
Tube Positioning Arm
SL-207D
Laser Shield
Non Engerized
Slightly Recessed
Tube
Positioning
Arm
.32 - .40"
(8.1 - 10.2 mm)
Energized
Platen Wall